National Taiwan Ocean University Institutional Repository:Item 987654321/43669
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 27320/39164
Visitors : 2478683      Online Users : 36
RC Version 4.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Adv. Search
LoginUploadHelpAboutAdminister

Please use this identifier to cite or link to this item: http://ntour.ntou.edu.tw:8080/ir/handle/987654321/43669

Title: Forecasting water stage at different lead-time by artificial neural network combined with flash flood routing model
Authors: WEN-CHENG LIU;CHUAN-EN CHANG;Chih-Chieh Young
Contributors: 國立臺灣海洋大學:海洋環境資訊學系
Date: 2015-03
Issue Date: 2017-10-24T07:28:12Z
Publisher: Taiwan Water Conservancy
Abstract: Abstract:Accurate forecasts of water stages during typhoon periods are critically important for flood control operations. The present study forecasts water stages for 1, 2, 4, and 6-hour ahead at the Taipei Bridge in the Tamsui River system. To improve the accuracy of forecasting, the water stage is calculated by the flash flood routing model at the first step and then the flash flood routing model is combined with two artificial neural network models (ANN), including the Back-Propagation Neuron Network (BPNN) and the Adaptive Network-based Fuzzy Inference System (ANFIS). Five and three typhoon events were used for model calibration (training) and verification, respectively. Six statistical indicators, including root mean square error (RMSE), mean absolute error (MAE), coefficient of efficiency (CE), index of agreement(IOA), error of peak water level (ELp), and Error of time to peak water level (ETp), are used to evaluate the performance of the combination with flash flood routing model and artificial neural network model. The results indicate that water stage forecasting using the combination of flash flood routing model and ANFIS model is better than that using the combination of flash flood routing model and BPNN model. Besides, both hybrid models reveal that the accuracy of water stage forecasting decreases as the lead-time increases.
Relation: 63
URI: http://ntour.ntou.edu.tw:8080/ir/handle/987654321/43669
Appears in Collections:[Department of Marine Environmental Informatics] Periodical Articles

Files in This Item:

There are no files associated with this item.



All items in NTOUR are protected by copyright, with all rights reserved.

 


著作權政策宣告: 本網站之內容為國立臺灣海洋大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,請合理使用本網站之內容,以尊重著作權人之權益。
網站維護: 海大圖資處 圖書系統組
DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback