English  |  正體中文  |  简体中文  |  Items with full text/Total items : 26994/38795
Visitors : 2387599      Online Users : 27
RC Version 4.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Adv. Search
LoginUploadHelpAboutAdminister

Please use this identifier to cite or link to this item: http://ntour.ntou.edu.tw:8080/ir/handle/987654321/40235

Title: Optimal tree-based release rules for real-time flood control operations on a multipurpose multireservoir system
Authors: Chih-Chiang Wei
Nien-Sheng Hsu
Contributors: 國立臺灣海洋大學:海洋環境資訊學系
Keywords: Reservoir operation
Decision-tree algorithm
Flood control
Release rules
Date: 2009-02
Issue Date: 2017-01-16T07:03:02Z
Publisher: Journal of Hydrology
Abstract: Abstract: This study presents a methodology to establish a set of optimal operation release rules which are tree-based rules for real-time flood control on a multipurpose multireservoir system. The derived rules can be used to determine the optimal real-time releases during flood periods. Steps of the proposed methodology involve: (1) collection of data, (2) building of flood database, (3) generation of optimal input–output patterns by running the flood control optimization model, (4) classification of training and testing data, (5) extraction of tree-based release rules for designed scenarios using the decision-tree algorithm (C5.0), (6) determination of optimal tree-based rules, (7) generation of the real-time forecast data by using the hydrological forecast model, (8) processing of reservoir real-time releases by simulating the reservoir real-time flood control operation, and (9) verification of the superior release rules through comparisons of tree-based rules, regression-based rules derived from a multiple-linear regression model and existing release rules. The developed methodology is applied to the Tanshui River Reservoir System in Taiwan to extract the decision trees for each scenario and then select the best ones with highest accuracy as the optimal tree-based rules. The derived optimal tree-based rules, regression-based rules and existing rules are compared by conducting the real-time operations in three historical typhoons, including Aere, Haima and Nock-ten in 2004. Results demonstrate that the solution using the derived tree-based rules have better performance than the regression-based rules and the existing rules in terms of reducing the peak stage at downstream control points, and meeting the target reservoir storage at the end of flood.
Relation: 365(3)
URI: http://ntour.ntou.edu.tw:8080/ir/handle/987654321/40235
Appears in Collections:[海洋環境資訊系] 期刊論文

Files in This Item:

File Description SizeFormat
index.html0KbHTML43View/Open


All items in NTOUR are protected by copyright, with all rights reserved.

 


著作權政策宣告: 本網站之內容為國立臺灣海洋大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,請合理使用本網站之內容,以尊重著作權人之權益。
網站維護: 海大圖資處 圖書系統組
DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback