English  |  正體中文  |  简体中文  |  Items with full text/Total items : 28611/40649
Visitors : 625117      Online Users : 76
RC Version 4.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Adv. Search
LoginUploadHelpAboutAdminister

Please use this identifier to cite or link to this item: http://ntour.ntou.edu.tw:8080/ir/handle/987654321/38242

Title: Applying fuzzy multi-objective linear programming to project management decisions with the interactive two-phase method
Authors: Ming-Feng Yang;Yi Lin
Contributors: 國立臺灣海洋大學:運輸科學系
Date: 2013
Issue Date: 2016-08-16T03:32:23Z
Publisher: Computers & Industrial Engineering
Abstract: Abstract: The aim of this paper is to develop an interactive two-phase method that can help the Project Manager (PM) with solving the fuzzy multi-objective decision problems. Therefore, in this paper, we first revisit the related papers and focus on how to develop an interactive two-phase method. Next, we establish to consider the imprecise nature of the data by fulfilling the possibilistic programming model, and we also assume that each objective work has a fuzzy goal. Finally, for reaching our objective, the detailed numerical example is presented to illustrate the feasibility of applying the proposed approach to PM decision problems at the end of this paper. Results show that our model can be applied as an effective tool. Furthermore, we believe that this approach can be applied to solve other multi-objective decision making problems.
URI: http://ntour.ntou.edu.tw:8080/ir/handle/987654321/38242
Appears in Collections:[運輸科學系] 期刊論文

Files in This Item:

File Description SizeFormat
index.html0KbHTML86View/Open


All items in NTOUR are protected by copyright, with all rights reserved.

 


著作權政策宣告: 本網站之內容為國立臺灣海洋大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,請合理使用本網站之內容,以尊重著作權人之權益。
網站維護: 海大圖資處 圖書系統組
DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback