English  |  正體中文  |  简体中文  |  Items with full text/Total items : 26988/38789
Visitors : 2326531      Online Users : 67
RC Version 4.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Adv. Search
LoginUploadHelpAboutAdminister

Please use this identifier to cite or link to this item: http://ntour.ntou.edu.tw:8080/ir/handle/987654321/34337

Title: 建立高精度與高效能之洪氾預警整合系統-子計畫:結合暴潮模式建立海岸越波預警模式 (III)
Establishment of a Coastal Wave Overtopping Warming Model with Incorporation of Storm Surge ( III )
Authors: 臧效義
Contributors: NTOU:Department of Harbor and River Engineering
國立臺灣海洋大學:河海工程學系
Keywords: 暴潮;洪氾預警;越波流量;POM;SWAN
storm surge;flood warning;overtopping discharge;POM;SWAN
Date: 2012-08
Issue Date: 2013-10-07T02:25:56Z
Publisher: 行政院國家科學委員會
Abstract: 摘要:為防禦全球氣候變遷加劇之影響引致之極端降雨所造成之河川暴洪,在下游河海口地區之溢淹災害,本計畫擬建立結合暴潮水位之海岸區域越波預警系統,提供河海口暴潮水位以及海岸保護結構物越波流量之即時資料,協助建構整體河川淹水模擬與洪氾預警資訊作業系統平台所用。執行方法將分別應用既有POM與SWAN公開模式,模擬林邊溪河海口受2009年莫拉克颱風引致之暴潮水位與波浪條件,再搭配水工模型試驗驗證及修正既有歐盟越波公式,以利應用於該河海口周遭海岸邊界之特性越波流量計算,期能建置即時演算系統,提供河道演算下游邊界以及整體計畫之洪氾預警系統之輸入條件,以達災害防禦之功效。三年期計畫研究的重點分別為:第一年的河海口周遭海岸水位時序列模式建置,第二年的越波量計算模式建置,第三年的預警作業整合測試。
abstract:Countermeasures to protect from the extreme flooding from the river and the coastal waters in the low-lying coastal lands in the vicinity of the river outlets due to global warming have been in urgent need recently. It is proposed in this study to establish an overtopping warning system with the storm surge prediction model as the input for setting up an integrated river flooding warning system. The study shall be carried out by applying existing POM and SWAN models for simulating the storm surge and overtopping discharges at the outlet of and coastal lands nearby Creek Lin-Bian due to recent Typhoon Morak. Calculations of the overtopping discharge shall adopt the revised formulae from the EU Overtopping Manual by conducting laboratory flume tests with local wave conditions and coastal configurations. The results shall be input into other sub-project as the river outlet boundary conditions for river discharge simulation so as to facilitate the performance of the integrated river flood warning system. The three-year goals for this proposal are “Establishment of synchronous water levels at river outlet” in the first year, “Establishment of overtopping discharge formula” in the second year, and “Integration of the river flood warning system” in the third year, respectively.
Relation: NSC101-2625-M019-001
URI: http://ntour.ntou.edu.tw/handle/987654321/34337
Appears in Collections:[河海工程學系] 研究計畫

Files in This Item:

File Description SizeFormat
index.html0KbHTML68View/Open


All items in NTOUR are protected by copyright, with all rights reserved.

 


著作權政策宣告: 本網站之內容為國立臺灣海洋大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,請合理使用本網站之內容,以尊重著作權人之權益。
網站維護: 海大圖資處 圖書系統組
DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback